Tracks installed at major intersections
Work at the intersections of George street with Bridge and Grosvenor Street as well as Hay Street were done over the Summer.
- 600m3 of concrete was added at the Hay Street intersection with 250m of track put in place
- A third rail was installed at the intersection of George Street with Bridge and Grosvenor Streets
Work will continue throughout 2018 in the CBD. See time-lapse video at the link below.
Article source: http://sydneylightrail.transport.nsw.gov.au/news/video-tracks-installed-major-intersections
Ray White’s top 10 listings for February: (Click on address to view listing)
Terrace 40, 42 Young Street Sydney
Suite 28.02, 1 Farrer Place GPT Sydney
Suite 9.03, 46 Market Street Sydney
Level 10, 387 George Street Sydney
Level 6, 23 O'Connell Street Sydney
Level 2, 1 Barrack Street Sydney
Part floor 23, 9 Castlereagh Street Sydney
Suite 2.01, 24 Hickson Road Sydney
Part Level 3, 22 Market Street Sydney
Level 4, 86 Liverpool Street Sydney