Tracks installed at major intersections

Work at the intersections of George street with Bridge and Grosvenor Street as well as Hay Street were done over the Summer.

  • 600m3 of concrete was added at the Hay Street intersection with 250m of track put in place
  • A third rail was installed at the intersection of George Street with Bridge and Grosvenor Streets

Work will continue throughout 2018 in the CBD. See time-lapse video at the link below.

Article source: http://sydneylightrail.transport.nsw.gov.au/news/video-tracks-installed-major-intersections


Ray White’s top 10 listings for February: (Click on address to view listing)

Terrace 40, 42 Young Street Sydney

Suite 28.02, 1 Farrer Place GPT Sydney

Suite 9.03, 46 Market Street Sydney

Level 10, 387 George Street Sydney

Level 6, 23 O'Connell Street Sydney

Level 2, 1 Barrack Street Sydney

Part floor 23, 9 Castlereagh Street Sydney

Suite 2.01, 24 Hickson Road Sydney

Part Level 3, 22 Market Street Sydney

Level 4, 86 Liverpool Street Sydney